IMG
| | | |

Save on Multiple Units with MEGAjoist

Save on Multiple Units with MEGAjoist

Scott from Rory Constructions has recently installed MEGAjoists on a big 8 unit development. Keep on reading to find out what Scott had to say!

  • Time & Labour Savings
    Engineered solution providing time and labour savings on the short & flat (2 degree pitch) balcony roofs on the 8 units (see pics) – was originally specified as LVL with graded battens
  • Make Changes on Site
    Able to cut on site a couple of times – we wanted to make adjustments where with pozi’s would have been impossible, but were able to cut the MEGAjoists onsite
  • No Sharp Edges
    Good size in line penetrations with no sharp edges to strip cables, ducts, fingers, etc
  • Short Lead Time
    Short lead times for manufacturing (typically 1 – 1.5 weeks from ordering)
  • Big Dollar Savings
    Big dollar savings on such a big project used for 2 levels of floors and all roofs (8 x 3 storey units)
  • Good Construction Plans
    Good construction plans of set outs for workers to follow onsite
  • CLICK HERE FOR MORE INFO ON THE MEGAJOIST LONG SPAN FLOOR JOISTS

  • CONTACT PETE FOR MORE INFO

    0424 225 913 or [email protected]