Save on Multiple Units with MEGAjoist
Scott from Rory Constructions has recently installed MEGAjoists on a big 8 unit development. Keep on reading to find out what Scott had to say!

Engineered solution providing time and labour savings on the short & flat (2 degree pitch) balcony roofs on the 8 units (see pics) – was originally specified as LVL with graded battens
Able to cut on site a couple of times – we wanted to make adjustments where with pozi’s would have been impossible, but were able to cut the MEGAjoists onsite
Good size in line penetrations with no sharp edges to strip cables, ducts, fingers, etc
Short lead times for manufacturing (typically 1 – 1.5 weeks from ordering)
Big dollar savings on such a big project used for 2 levels of floors and all roofs (8 x 3 storey units)
Good construction plans of set outs for workers to follow onsite